Projects - Procurement

Projects - Procurement - Studies - Services


For the development of the Integrated Waste Management System of Western Macedonia, DIADYMA SA implements actions such as Projects, Procurement, Studies and Services.
Their implementation is done through its services or in collaboration with external partners, while the financing for their implementation is secured by leveraging both public and private financial resources.

       Title Financial Instrument      Budget                 Description
Waste React: Integrated waste management facilities for boosting recycling and composting in 7 Regions through cross-border activities INTERREG IPA CBC Programme “Greece – Albania 2014 – 2020” 888.654,03 Local Waste Management Unit of Kastoria /Reuse and Recycling Infrastructures
Local Waste Management Unit of Florina /Reuse and Recycling Infrastructures
Local Waste Management Unit of Deskati /Reuse and Recycling Infrastructures
Supply of special mobile equipment: Small object collection vehicle and medium-sized object collection vehicle
Greenpoint - MOB: Development of a mobile Green Point at the cross-border region and promotion of prevention and recycling INTERREG IPA CBC Programme “Greece – Albania 2014 – 2020” 200.901,83 Supply of two metal containers (closed)
Symbiosis: Symbiotic Networks of Bio-Waste Sustainable Management INTERREG IPA CBC Programme “Greece – Republic Of North Macedonia 2014 – 2020” 225.257,33 Supply of 200 biowaste bins of 660lt
Supply of a green shredder
Less Waste II: Development of an Action Plan for the Management of Bio-wastes at the Cross-Border Region- Acronym: LESS-WASTE-II INTERREG IPA CBC Programme “Greece – Republic Of North Macedonia 2014 – 2020” 174.351,78 Supply of a green shredder
Supply of waste collection bins Own Resources 443.595,00 Supply of plastic wheeled bins with a capacity of 660 lt and 1,100 lt for the collection of mixed waste
Supply of metal wheeled bins with capacity of 1,100lt for the collection of mixed waste
Supply of plastic wheeled bins with capacity of 240lt- 360lt- 660lt for the collection of recyclable materials
Provision of biogas collection and exploitation services at the Landfill of the Central Facilities of Waste Management of the Region of Western Macedonia for the production of electricity Own Resources 7.760.765€ Construction of infrastructure and network for the utilization of biogas by the A 'and B' Cells of the landfill for energy production
Study, Financing, Construction, Maintenance and Operation of Infrastructures of the Integrated Waste Management System of the Region of Western Macedonia with PPP PPP Construction:
49.000.000€
Construction:
300.000.000€
(Public Investment Programme: 134.000.000€)
• Construction of the Mechanical and Biological Treatment plant (MBT)
• Construction of the Landfill (for the residues of MBT)
• Construction of the Local Waste Management Unit (LWMU) of Kozani
• Operation of the MBT, of the residues landfill and all 10 LWMU of the Integrated Waste Management System of the Region of Western Macedonia for 25 years, along with mixed municipal solid waste management
Action and program planning services for the completion of the Regional Waste Management Plan of Western Macedonia PA (Partnership Agreement) 300.000€ Study for the completion of the Regional Waste Management Plan of Western Macedonia
For the needs of the Integrated Waste Management System of Western Macedonia – Supply of waste management equipment PA (Partnership Agreement) 11.425.000€ • Supply of transhipment equipment
• Supply of collection equipment
• Supply of waste bins
• Supply of bulky waste shredder
• Supply of special waste management equipment
• Supply of equipment for the Central Facility of Waste Management
Additional infrastructure of the Integrated Waste Management System of Western Macedonia PA (Partnership Agreement) 8.787.886,18€ • Construction of the 3rd landfill cell
• Completion of infrastructure in the Local Waste Management Unit of Eordaia
• Completion of infrastructure in the Local Waste Management Unit of Grevena
Recycling infrastructure in the Local Waste Management Unit of Florina Theseus 264.000€ • Construction of infrastructure for the management of the recyclable materials in the Local Waste Management Unit of Amyntaio
• Construction of infrastructure for the management of the recyclable materials in the Local Waste Management Unit of Florina
Recycling infrastructure in the Local Waste Management Unit of Kastoria Theseus 268.000€ Construction of infrastructure for the management of the recyclable materials in the Local Waste Management Unit of Kastoria
Recyclable Materials Management Infrastructure HRRC (Hellenic Recovery Recycling Corporation) 574.800€ • Construction of the Recycling Material Sorting Center (RMSC)
• Supply of the mobile operating equipment of RMSC
Construction of a site for the controlled disposal of aggregates and excavation materials of the Prefecture of Kastoria Theseus 45.000€ • Construction of a site for the controlled disposal of aggregates and excavation materials of the Prefecture of Kastoria
Waste Transfer Station of Grevena Theseus 586.000€ Construction of the Local Waste Management Unit of Grevena
Studies of waste management projects in the Region of Western Macedonia Theseus 308.000€ Studies of waste management projects in the Region of Western Macedonia for the Municipalities of Grevena, Kastoria, Kozani and Florina
Recycling and Recovery of materials: Regional Environmental use and Infrastructure INTERREG IIIA 629.000€ Construction of the Local Recycling Center of Florina
Nature Reshaping Landscapes INTERREG IIIC (RFO) 61.000€ Rehabilitation of the Waste Disposal Area of the Kozani-Ptolemaida axis
Rehabilitation of Uncontrolled Waste Disposal Area in the Region of Western Macedonia ΕΠΠΕΡ Operational Program for the Environmen 6.177.290€ Rehabilitation of Uncontrolled Waste Disposal Area for the Municipalities of Grevena, Kastoria, Kozani and Florina
Rehabilitation of the Waste Disposal Area in the Region of Western Macedonia ΕΠΠΕΡ Operational Program for the Environmen 2.265.760€ Rehabilitation of six (6) Waste Disposal Areas: Kastoria, Grevena, Florina, Tsotili, Velvendo and Argos Orestiko
Implementation of the Local Waste Management Unit of Grevena Theseus 586.000€ Construction of the Local Waste Management Unit of Grevena
Waste management projects of the Integrated Waste Management System of Western Macedonia Rop III (Regional Operational Programme) 4.172.000€ • Construction of the Local Waste Management Unit of Deskati
• Supply of the mobile equipment
• Rehabilitation of the Waste Disposal Area of Kozani
Programme Contract for the Operation of a temporary Waste Disposal Area Special Development Programme of the Prefecture of Kozani 300.000€ Operation of a controlled Waste Disposal Area for 10 Municipalities of the Prefecture of Kozani
Programme Contract for the Operation of a Waste Disposal Area Special Development Programme of the Prefecture of Kozani 276.000€ Operation of a controlled Waste Disposal Area for the Municipalities of Kozani and Ptolemaida
Programme Contract for the Construction and the Operation of a Waste Disposal Area Special Development Programme of the Prefecture of Kozani 369.773€ Construction and Operation of a controlled Waste Disposal Area for the Municipalities of Kozani and Ptolemaida
Integrated Waste Management System of Western Macedonia Region - Recycling Rop III (Regional Operational Programme) 117.388€ Supply of vehicles, temporary storage bins and containers
Integrated Waste Management System of Western Macedonia Region – Mechanical Collection Rop III (Regional Operational Programme) 1.379.310€ Supplies of a waste collection vehicle and temporary mixed waste bins
Integrated Waste Management System at the level of the Region of Western Macedonia Cohesion Fund 2000 - 2006 12.974.868€ • Construction of A and B landfill cells
• Construction of seven (7) Local Waste Management Unit: Amyntaio, Voio, Eordaia, Kastoria, Servia, Siatista and Florinas
• Supply of the mobile equipment for the operation of the landfill
• Supply of the mobile equipment for waste transfer
• Studies for project maturation